Praise God! We have now received planning consent for the a new church centre on the former MFI premises on Castle Boulevard. A large number of documents were produced in support of the planning application and a list is provided below for further information. Please note that some of the documents are quite large.
Our focus is now on the detailed design and specification of the interior. These pages will continue to be updated as the design progresses over the coming months, so please keep checking back for the latest updates and progress.
| Looking East along Castle Boulevard | Download (230kb) |
| Looking North across Castle Boulevard | Download (185kb) |
| Looking West along Castle Boulevard | Download (175kb) |
| Location Plan | Download (2.0Mb) |
| Site Plan | Download (3.6Mb) |
| Ground Floor Layout | Download (1.8Mb) |
| First Floor Layout | Download (650kb) |
| South Elevation | Download (2.5Mb) |
| East Elevation | Download (1.0Mb) |
| West Elevation | Download (2.3Mb) |
| North Elevation | Download (1.0Mb) |
| Planning Statement | Download (750kb) |
| Design and Access Statement | Download (5.6Mb) |
| Transport Statement | Download (6.2Mb) |
| Travel Plan | Download (5.6Mb) |
| Acoustic Engineer's Report | Download (602kb) |
| Energy Statement | Download (920kb) |
| Utilities Statement | Download (100kb) |
| Ground Investigation Report | Download (3.3Mb) |
| Habitat and Protected Species Report | Download (888kb) |
| Tree Assessment Report | Download (1.4Mb) |